Impact Windows for Fort Lauderdale New Construction — In the Plans From Day One.
We protect your build schedule. Inspections pass first visit. We're involved before the shell is up and on time to every milestone.
One Failed Inspection Costs You Days. A Sub Who's Not Ready on Install Day Costs You Weeks.
We've built our entire operation around not being that problem. We assist with the energy calculations, confirm the rough opening specs, manage the order timing — everything on our side of the job. We coordinate around your build sequence. We show up when your shell is ready. Inspectors sign off. You move on. That's what working with us looks like on the first job. And the second. And every one after that.
“Quality is outstanding. Professional, efficient. Highly recommend Sunstorm Construction.”— Josh Dotoli, Fort Lauderdale Luxury Real Estate Developer
Three Things Every Builder Needs Their Subs to Protect
Your Schedule
A sub who doesn't show up on time costs you days. We're built to avoid that. Same crew, coordinated around your build sequence. When we say we'll be there, we're there. New construction installs typically run 1–1.5 weeks. We'll confirm your specific window at permit issuance — before you need to schedule anything else around us.
Your Reputation
Developers in Las Olas can't afford a bad referral. Every job we've done is in the portfolio. Every address is real. Every client can be called.
Your Sanity
You shouldn't have to babysit a subcontractor. When we're on a job, we handle it. You'll hear from us when it's done — not when there's a problem.
From Plans to Final Inspection
Energy Calcs & Specs
We assist with energy calculations and confirm rough opening dimensions before the order goes in. No surprises at rough-in.
Order Timing
We manage the order so materials arrive when your shell is ready — not months early sitting on a job site, not months late holding up your CO.
Install Day
We show up on time. Same crew every job. Ricky supervises every installation personally.
Final Inspection
Ricky walks every job before the inspector arrives. We don’t fail city inspections.
Most Subs Caulk Frame to Block and Call It Done. That’s Our Last Step.
We build three independent layers of waterproofing before the standard final seal. A failure at one layer doesn’t compromise the next. We don’t get water intrusion callbacks.
We take full ownership of the window and door project on every job — so it comes out right the first time, every time.
“This isn’t something we’d put in an ad — but it’s worth knowing. On one job, a Fort Lauderdale city inspector walked onto an 8,000 square foot mansion we were completing. He told me: when he saw the size of the house, he expected to have a long day. Then he saw my name on the permit. He said he knew right then that everything was going to be done right and he was going to have an easy day. That’s two inspectors who’ve told me something like that. City inspectors have referred friends and jobs to us directly. We’re not going to overclaim that — but if you’re thinking about what an inspector thinks of your sub’s work, that’s the kind of work we do.”
What Builders and Developers Say
“Great service! At a fantastic Price. A+++”
“They did everything they said they would do, when they said they would do it.”
“You’re kicking butt on this job for us. Thank you very much.”
Tell Us About Your Project
We’ll respond same day.
Ready to Add a Sub Who Doesn’t Create Problems?
We protect your schedule. Inspections pass. You move on.
Get Your Free Quote Today
Most homeowners hear back within 48 hours. No pressure, no obligation.